Feed In Tariff

The Feed in Tariff is no longer available and has been replaced by the Smart Export Guarantee (SEG).

The Feed In Tariff and the Smart Export Guarantee

The Feed in Tariff is no longer available and has been replaced by the Smart Export Guarantee (SEG). The SEG requires the large licensed energy suppliers to provide at least one export tariff to Solar PV generators generating a maximum of 5MW. Smaller energy suppliers can take part on a voluntary basis.

Battery Storage and the SEG

During the event of a powercut some battery storage systems, such as the Tesla Powerwall back-up v2.0 system, will allow you to use your solar panels and stored electricity when the grid is down. The Tesla Powerwall back-up v2.0 system will also allow you to import electricity during the off-peak electricity tariff period thus allowing you to use the imported off-peak electricity during the peak period.

To benefit from the SEG you will need to satisfy the following criteria:

1. Your system is not receiving the FIT

2. Your renewable generation should not be generating more than 5MW of electricity

3. Have a half-hourly export reading grid meter

4. Your installation must be MCS certified

If you need further information on the SEG process and tariff comparisons please visit the Solar Trade Organisation

Download your FREE Consumer Guide to Solar Panels below:

Everything you need to know in one place – How to get a great installation and avoid the pitfalls

The table below outlines the historic Solar PV FIT payments from 1st April 2018 to 31st March 2019

Band (kW)
PV Tariff Level*
 

1 Apr to
30 Jun 2018

 

 1 Jul to
30 Sep 2018
1 Oct to
31 Dec 2018
 

1 Oct to
31 Dec 2018

 

≤ 10kW

(not standalone)

Higher 4.01  3.93  3.86 3.79
Middle 3.61  3.54 3.47 3.41
Lower 0.31  0.25 0.20 0.15
> 10kW-50kW

(not standalone)

Higher 4.25  4.17  4.11 4.03
Middle 3.83  3.75 3.70  3.63
Lower 0.31  0.25 0.20 0.15
>50kW-250kW

(not standalone)

Higher 1.85  1.79  1.75 1.69
Middle 1.67  1.61 1.58 1.52
Lower 0.31  0.25 0.20 0.15
>250kW-1000kW

(not standalone)

1.50  1.43   1.38 1.33
>1000kW 0.31  0.25   0.20 0.15
Stand-alone 0.15  0.13   0.10 0.07

 

* PV Tariff level as detailed below:

Higher tariff rate will be applied if an EPC of level D or above is achieved before commissioning

Middle tariff rate will be applied if an EPC of level D or above is achieved before commissioning but the generator owns 25 or more installations

Lower tariff rate will be applied if an EPC of level D or above is achieved after the commissioning

All tariff rates are in pence per kilowatt hour at 2018/19 values

 

 

What out clients say

Location WD3

I wanted to have solar panels and a battery fitted. I’ve had 5 quotes from £10k – 13k. I spoke with Glenn today who talked me through the process. He used the “Sun Seekers” App to establish that Solar is NOT viable at my house due to shading and other factors due to nearby trees. This has saved me £10k as I was almost going ahead this week with another firm who never mentioned that this was an issue! The four other firms likewise did not mention that shading was an issue. This is a company that I feel I 100% trust. Thank you for your time and honest professional advice Glenn